The City of Rancho Palos Verdes Public Works Department The City of Rancho Palos Verdes Public Works Department

PUBLIC WORKS

SAN RAMON CANYON / 25th STREET STABILIZATION PROJECT

PROJECT STUDY REPORT
SAN RAMON CANYON DRAINAGE SYSTEM


TABLE OF CONTENTS & PROJECT REPORT


APPENDIX

Appendix A - Topographic Map

Appendix B - GMU Geotechnical Report

Appendix C - SFC Environmental Expanded Initial Study

Appendix D - San Ramon Hydrology


Appendix E - Existing City of Los Angeles Storm Drain (Asbuilts, Hydrology and
Hydraulics)

Appendix F - Design Alternatives Detailed Discussion

Appendix G - Proposed Alternatives (Plans, Hydrology and Hydraulics)

Appendix H - Cost Estimates

Appendix 1- Letter to Gordon Teuber (,,25th Street Interim Basin Grading" Solution)

Appendix J - Table 1 Design Criteria

 

 

 

 

 

 

 

 

 

 

 

 

WASTE REMOVAL / RECYCLING
Waste Removal
Recycling Programs
HHW/E-Waste
Conservation Programs
TRAFFIC
Traffic Calming Guidelines
Traffic Alert System
Traffic Commission Quick Links
CONTACT/COMMENT
Report a Non-Emergency Service Request
Submit a Comment
Join the Listserv

Click on the icon
to download Adobe Reader